Lombard Park District

Lombard Park District Comprehensive Master Plan

Issue link: https://lombardparks.uberflip.com/i/1269752

Contents of this Issue

Navigation

Page 123 of 217

Lombard Park District 124 Chapter Six Southland Park Grace Street and Central Avenue ELE WATER STORM SAN GAS TEL Utilities available: Classifi cation Neighborhood Acres 15.59 Tax Number 06-17-316-010 Acquired 1966, 1981 Neighborhood Park Observations Natural Resources and Environmental Conditions • The stormwater detention basin on the south serves as a constructed wetland. • The park includes a detention basin with native planting and rock stabilizing the edge. • A swale runs east-west on the south side of the soccer fi eld and north of the sled hill and baseball fi eld. • The park landscape is composed of turf and shade trees. Site Design and Aesthetics • The park has open areas for non-programmed use. • The park includes a playground with a 2-12 play structure, dinosaur spring rider, sand play, 2 belt swings, and engineered wood fi ber surfacing. Other park amenities include a 250-300 ft. baseball fi eld (#21), a sledding hill, and soccer fi eld. • The soccer fi eld serves both soccer and ultimate frisbee players. • The baseball fi eld lacks dugouts. • The park includes a .49 mile trail system that lies around the northern perimeter but does not connect to the southern portion of the park. • Site furniture found throughout the park include benches, trash receptacles, bleachers, and picnic tables. • The park is well maintained and free of litter. • Park identifi cation signs are present. • An off -street asphalt parking area is provided at the park that can accommodate approximately 47 cars. Health, Safety, and Compliance • The east playground environment/structure is new and complaint with ASTM/ CPSC standards. • Access to the detention pond is not encouraged. • The playground has adequate separation from the roadway. • The park's street frontage allows for adequate surveillance. • Rules signs are not present. Users and Context • The park has internal walkways and connection to the neighborhood walk system. Recommendations and Considerations □ PLAN: upgrade of spectator areas at baseball fi eld □ PLAN: accessible route between baseball fi eld and parking lot □ DESIGN: consider locating fan/player area for soccer above the swale in a drier location □ DESIGN: consider loop trail with fi shing access □ DESIGN: consider shelter near playground Quantity Year Built .49 1994 Trails-Multi-Use (miles) Trails-Nature(miles) Trails-Fitness (Stations) 1 2012 Restrooms (portable) Concessions Storage Faclity/Building Picnic Shelter Picnic Area 1 1996 Playground 1 1996 Sand Play Baggo Basketball 1 2006 Baseball Batting Cages Bocce Disc Golf (holes) Driving Range Football Golf (holes) Roller Hockey Skate Park Sledding HIll 1 Soccer Softball Tennis Volleyball • Fishing Fishing Dock Ice Skating Swimming Pool Splash Pad Irrigation Lighting 47 2007 Parking (spaces) Floodway 100 Year Floodplain Water Wetland

Articles in this issue

Archives of this issue

view archives of Lombard Park District - Lombard Park District Comprehensive Master Plan